Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
En studie om tidig samverkansentreprenad
University of Borås, Faculty of Textiles, Engineering and Business.
University of Borås, Faculty of Textiles, Engineering and Business.
2020 (Swedish)Independent thesis Basic level (university diploma), 180 HE creditsStudent thesisAlternative title
A study regarding Early Contractor Involvement (English)
Abstract [sv]

Eftersom samhället ständigt utvecklas och det ställs allt högre krav på snabba lösningar och metoder måste byggbranschen möta detta behov och tänka från ett nytt perspektiv. I denna rapport har vi studerat de mest använda kontraktsformer totalentreprenad, utförandentreprenad och samverkansentreprenad. Samverkansentreprenad är en kontraktsform som inte är lika mycket beprövad som utförandeentreprenad och totalentreprenad. Det finns flera benämningar för samverkansentreprenad såsom partnering och tidig entreprenörmedverkan men dem är alla lika i hur beställaren jobbar med entreprenörer. I stora bygg och anläggningsprojekt med högteknisk komplexitet krävs det hög kompetens inom projektering. Dessa stora och komplexa projekt kan ibland vara problematiska då entreprenören i vissa fall inte har tillräckligt med teknisk kompetens vilket gör att det ofta uppstår stora förluster då ändring, tillägg och avgående arbeten samt andra oväntade händelser uppstår. Detta har fått många att tro på tidig entreprenörsinvolvering som lösningen av detta problem då beställaren kan dra nytta av entreprenörens erfarenheter. Därav syftet i rapporten har varit att undersöka möjligheten att höja effektiviteten samt förbättra ekonomin på ett bygg-och anläggningsprojekt med hjälp av samverkansentreprenad. Detta har gjorts genom litteraturstudier, intervjuer och möten med handledare på Trafikverket vid flertal tillfällen. Det som framkommit av studien om tidig samverkansentreprenad är att projekteringsprocessen blir väldigt lång men uppstarten av projekten blir effektiva. Däremot behöver modellen utvecklas mycket för att uppnå de resultat som efterfrågas. Det största problemet med tidig entreprenörmedverkan är att gemensamt komma överens om ett pris.

Abstract [en]

Because the society constantly is evolving and higher demand is made on fast solutions and methods therefore the building branch have to adapt and meet these needs and think from a new perspective. In this report we have studied the most common contract forms design plant and turnkey and Collaboration construction. Collaboration construction is a contract form that is not as proven like design plant and turnkey. There are several denominations for Collaboration construction such as partnering and early contractor involvement, they are all equal on how the purchaser is working with the contractor. In big construction and plant projects with high technical complexity it requires high competence in projection. These big projects can sometimes be problematic because the contractor has insufficient technical competence which causes big losses because of changes, additions and outgoing works and also other unexpected events. This has led many to believe that early contractor involvement could be the solutions to this problem since the purchaser could benefit from the contractor’s experience. Therefore, the purpose has been to investigate the opportunities to increase efficiency and improve the economy on a construction/plant project using interaction construction. This has been done through literature studies, interviews and meetings with our supervisor on Trafikverket at several occasions. The conclusion of this report is that early contractor involvement makes the design process very long, but the start-up of the projects become effective. However, this model needs to be developed to achieve the results requested. The biggest problem with early contractor involvement is to jointly agree on a price.

Place, publisher, year, edition, pages
2020.
Keywords [en]
design plant, turnkey, collaboration construction, early contractor involvement, projection, building- and construction project
Keywords [sv]
utförandeentreprenad, totalentreprenad, samverkansentreprenad, tidig entreprenör, medverkan, projektering, bygg- och anläggningsprojekt
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hb:diva-23724OAI: oai:DiVA.org:hb-23724DiVA, id: diva2:1460759
Supervisors
Examiners
Available from: 2020-09-17 Created: 2020-08-25 Last updated: 2025-09-24Bibliographically approved

Open Access in DiVA

fulltext(831 kB)591 downloads
File information
File name FULLTEXT01.pdfFile size 831 kBChecksum SHA-512
71a2107460ade8245bbaea222a2ca262ea92dbd4e507563b7ee7b3d75f6cebfeb2ca35656392126630f167853dae067c578946118a03d0d50c6a63ebea310703
Type fulltextMimetype application/pdf

By organisation
Faculty of Textiles, Engineering and Business
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 591 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 426 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf