Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Designing a Process Measurement Program as a part of Measurement & Analysis Process Area of CMMI Level 2
Högskolan i Borås, Institutionen Ingenjörshögskolan.
Högskolan i Borås, Institutionen Ingenjörshögskolan.
2009 (Engelska)Självständigt arbete på avancerad nivå (magisterexamen)Studentuppsats (Examensarbete)
Abstract [en]

This master’s dissertation stands as a guideline for defining a measurement program for GEEE that can be piloted at the Gothenburg site EEEG. The measurement program is based on the “CMMI process area Measurements and Analysis, Level 2”. The proposed measurement program is designed in such a way that is applicable for repeatable process measurement with potential minor alters depending on the nature of the process being examined. Major effort has been made on creating a program that not only collects the numerical data but also delivers substantial results in terms of goal setting, data analysis and decision making. Designing a process for measurement facilitate organizational strategy toward process improvements. This measurement program is designed with the help of some well-known methods such as: GQM (Goal-Question-Metric), PDCA (Plan-Do-Check-Act) and ETVX (Entry-Task-Validation- Exit) where five major phases are resulted, namely; Identify, Define, Collect data, Analysis, Evolve, thereafter embedded in a template-shaped tool. The whole template, after a complete fulfillment, would provide the organization with a guideline to achieve the organizational objectives. It is vital to mention that this template itself does not improve the processes. It only shows the status of the chosen project/process after having the filled template executed. What this template generates is to provide the stakeholders with necessary information and basis to make informed decision afterwards in order to improve the chosen processes/projects. Since the processes in “Maturity Level 2 of CMMI” are project based, it is important the status of processes can be measured and communicated. This procedure plays a crucial role in creating a platform for moving to the next maturity level.

Ort, förlag, år, upplaga, sidor
University of Borås/School of Engineering , 2009.
Serie
Magisteruppsats
Nyckelord [en]
process measurement program, measurement program, process measurement
Nationell ämneskategori
Teknik och teknologier
Identifikatorer
URN: urn:nbn:se:hb:diva-19577Lokalt ID: 2320/5477OAI: oai:DiVA.org:hb-19577DiVA, id: diva2:1311511
Tillgänglig från: 2019-04-30 Skapad: 2019-04-30 Senast uppdaterad: 2025-09-24

Open Access i DiVA

fulltext(1502 kB)385 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 1502 kBChecksumma SHA-512
32273fc0080b59a0c0e1cd9f8bcc70dc66d6ba87c327c797e2fff4511df612bea34fb07e7ab48400b0a1dab872f7ae0a81ce94b9a6594f99c9b1233e1613d32e
Typ fulltextMimetyp application/pdf

Av organisationen
Institutionen Ingenjörshögskolan
Teknik och teknologier

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 387 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 252 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf