Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Förbättring av leveransprestation: En fallstudie av orderprocessen i ett uthyrningsföretag inom byggbranschen
Högskolan i Borås, Akademin för textil, teknik och ekonomi.
Högskolan i Borås, Akademin för textil, teknik och ekonomi.
2017 (svensk)Independent thesis Basic level (professional degree), 10 poäng / 15 hpOppgaveAlternativ tittel
Improving delivery performance : A case study of the order fulfillment process in a rental company in the construction industry (engelsk)
Abstract [sv]

En undermålig leveransprestation av maskiner och utrustning skapar problem i hela försörjningskedjan för ett byggprojekt. Ifall maskiner och utrustning inte levereras efter överenskommen tid, bidrar det till stillestånd och förseningar av byggprojektet. Bygget stannar upp om inte rätt maskiner, finns på rätt plats, i rätt skick och i rätt kvantitet. Syftet med studien är att identifiera vilka moment som tillsammans utgör orderprocessen i uthyrningsbranschen och vad som påverkar tillförlitligheten av leveranser för uthyrning av maskiner och utrustning till byggbranschen. En processkartläggning har identifierat fem moment i orderprocessen, kundkontakt, ordermottagning, orderhantering, leverans och returer. För att veta hur väl orderprocessen presterar behöver mätetal införas. Utan mätetal är det svårt att veta ifall maskiner och utrustning levereras efter vad som överenskommits med kund. Mätetal underlättar även för förbättringar i processer då det går att jämföra mot tidigare mätetal för att se ifall en förbättring har blivit en förbättring eller enbart en förändring. En kombination av mätetal på tillförlitlighet från Supply Chain Operations Reference Model samt tillämpningar och metoder från Supply Chain Management kan förbättra tillförlitligheten av leveranser i en försörjningskedja som förser byggbranschen med maskiner och utrustning.  

Abstract [en]

A poor delivery performance of machines and equipment creates problems throughout the supply chain for a construction project. If machines and equipment do not arrive in compliance with agreed upon time, it will cause downtime and delays at the construction site. The construction site will come to a standstill if not the right machines is at the right place, at the right time, in the right condition and in the right quantity. The purpose of the report is to identify which elements constitute the order process for rental of machines and equipment, as well as provide suggestions on how the elements can be improved to increase the reliability of deliveries to and from construction projects. With process mapping five elements of the order process have been identified, customer support, receiving of orders, processing of orders, deliveries and returns. To know the performance of the order fulfillment, measurements need to be introduced. Without metrics, it is difficult to know if machines and equipment arrive at the construction site correctly. Metrics also facilitate improvements in processes as it is possible to compare to previous measures to see if an improvement has been an improvement or just a change. If metrics on reliability from the Supply Chain Operations Reference Model is combined with practices and methods from Supply Chain Management the reliability of deliveries in the supply chain that supplies the construction industry with machines and equipment can be improved.  

sted, utgiver, år, opplag, sider
2017.
Emneord [en]
Supply Chain Management, Logistics in the construction industry, Logistics, Supply Chain Operations Reference Model, Construction Supply Chain Management, Five Why, Ishikawa-diagram, Perfect order fulfillment.
Emneord [sv]
Supply Chain Management, Logistik inom byggbranschen, Logistik, Supply Chain Operations Reference Model, Construction Supply Chain Management, Fem varför, Fiskbensdiagram.
HSV kategori
Identifikatorer
URN: urn:nbn:se:hb:diva-12802OAI: oai:DiVA.org:hb-12802DiVA, id: diva2:1147146
Fag / kurs
Mechanical engineering
Tilgjengelig fra: 2017-10-16 Laget: 2017-10-05 Sist oppdatert: 2025-09-24bibliografisk kontrollert

Open Access i DiVA

fulltext(1029 kB)521 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 1029 kBChecksum SHA-512
f042f4c2089f9aa20980d5950711bf3260b32fa4e2d558fbfdc62af85c2eb18505b890b5e1feeb92beba05536ca02912e21eff8485b54c1b6d2586c7d7862fd2
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 526 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 782 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf