Planned maintenance
A system upgrade is planned for 10/12-2024, at 12:00-13:00. During this time DiVA will be unavailable.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Material replenishment system
University of Borås, Faculty of Textiles, Engineering and Business.
University of Borås, Faculty of Textiles, Engineering and Business.
2016 (English)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

This thesis work has been written both for and in co-operation with the company IAC Group Gothenburg. The main purpose of the report is to find a new alternative material replenishment system which will improve the internal material flow and eliminate unnecessary work activities such as manual call offs. The aim is to find a new system to reduce the incidental costs incurred and improve customer service in quality and performance. Observations and interviews were conducted and an analysis of the current situation was made. Waste was identified in the form of unnecessary transport, specifically in milk runs, where time was spent looking for materials to be loaded. This creates uncertainty and may contribute to increased costs and poor customer service. Three different options for a new replenishment system were developed which were compared with the theory and present situation. The proposal was evaluated with respect to cost, available support, complexity and future compatibility. The analysis of the theory and current state shows the importance of a long-term solution with few risks of waste. The solution that best cope with this is an e-Kanban system that automates the replenishment system and would make manual material call offs disappear completely. The conclusion is that an e-Kanban system is the best long term option for a manufacturing company like IAC because it is highly adaptable to change, and can be integrated in the company’s ERP system. The recommendation is to implement a new e-Kanban system. First, it should be tested on a pilot station and then introduced to the whole production process.

Place, publisher, year, edition, pages
2016.
Keywords [en]
TPS, Lean Management, JIT, Kanban, Material Planning, MRP, ERP
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hb:diva-10750OAI: oai:DiVA.org:hb-10750DiVA, id: diva2:974230
Subject / course
Industriell ekonomi
Available from: 2016-09-26 Created: 2016-09-26 Last updated: 2016-09-26Bibliographically approved

Open Access in DiVA

fulltext(1548 kB)2819 downloads
File information
File name FULLTEXT01.pdfFile size 1548 kBChecksum SHA-512
d03cb8845a3582a234f6d99ccd382ea357272c805c4835c96d73f0da7bcb65e3d668b2081978106cd6176ff30791405f889d8558319a38554909aff364f032cf
Type fulltextMimetype application/pdf

By organisation
Faculty of Textiles, Engineering and Business
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 2832 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 976 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf