Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Effektiv logistikplanering: Effektiv logistikplanering på NCC Anläggning
University of Borås, Faculty of Textiles, Engineering and Business.
University of Borås, Faculty of Textiles, Engineering and Business.
2015 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Effective logistics planning : Effective logistics planning at NCC Ground construction (English)
Abstract [sv]

Anläggningsarbeten är vägbyggen, markberedning, grundläggning och finplanering av mark. Dessa arbetsområden är ofta trånga och i de fallen behövs en effektiv logistikplanering. Vid anläggningsarbeten krävs ofta ett samspel med många inblandade parter så som husbyggen där flera aktörer är inblandade, eller som vid infrastruktur där det på arbetsplatsen krävs ett samspel mellan arbetsfordon och övriga trafikanter. Ett anläggningsbygge är flexibelt och eventuella komplikationer i arbetet är ibland svårt att förutse. Leveransplaneringen måste fungera för att produktionen ska fortgå, då är det viktigt att veta hur leveranskedjans olika delar ser ut, samt logistikens betydelse för tidplanen. För att förbättringar ska uppnås vid inköp och leveranser spelar leverantören en nyckel roll. Enligt LEAN-metoden ska det tydligt klargöras för leverantörerna hur arbetet ska gå till med leveranser samt att dessa ska hålla sin del i avtalet. Ett arbete med att införa Just In Time-leveranser minskar mängden av lagrat material på arbetsplatsen avsevärt och 5S-rutiner ger en mer säker och strukturerad arbetsplats.

Abstract [en]

Construction work is road construction, site preparation, foundation and advanced scheduling of land. These areas are often narrow and this cases requires an effective logistics planning. Ground construction is often required interaction with many involved parties such as house building where several actors are involved or in the infrastructure where the workplace requires an interaction between the work vehicles and other road users. The ground construction is flexible and possible complications of the work is sometimes difficult to anticipate. Delivery planning must work for production to proceed and it is important to know how the supply chains different parts look like, as well as the importance of logistics for the time schedule. For improvements to be achieved in purchasing, the suppliers play a key role. According to LEAN method there must clearly be made to the suppliers how the work should be proceed with deliveries and that they have to keep their part of the agreement. Just In Time deliveries reduce the amount of stored material in the workplace significantly and 5S routines provide a more secure and structured workplace.

Place, publisher, year, edition, pages
2015. , p. 33
Keywords [en]
Logistics, Planning, Construction, Delivery calendar, Lean, Just In Time, 5S
Keywords [sv]
Logistik, Planering, Anläggning, Leveranskalender, Lean, Just In Time, 5S
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hb:diva-766OAI: oai:DiVA.org:hb-766DiVA, id: diva2:854238
Subject / course
Byggteknik
Uppsok
Technology
Available from: 2015-09-24 Created: 2015-09-16 Last updated: 2015-09-24Bibliographically approved

Open Access in DiVA

fulltext(490 kB)929 downloads
File information
File name FULLTEXT01.pdfFile size 490 kBChecksum SHA-512
cf4dc204f75aa4b1600d84398d33fc81c2bb11493c4c39400d23ad03c7a9f8aa24e1abde7c8bc122f02ffae8100751a261710f27f2a701e28b31b7b3e8e02e26
Type fulltextMimetype application/pdf

By organisation
Faculty of Textiles, Engineering and Business
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 929 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1296 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf