Planned maintenance
A system upgrade is planned for 10/12-2024, at 12:00-13:00. During this time DiVA will be unavailable.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Materialflöde som förutsättning för platsbaserad planering av jobb på byggarbetsplatser
University of Borås, Faculty of Textiles, Engineering and Business.
University of Borås, Faculty of Textiles, Engineering and Business.
2021 (Swedish)Independent thesis Basic level (university diploma), 180 HE creditsStudent thesisAlternative title
Material flow as a prerequisite for site-based planning of jobs at construction Sites (English)
Abstract [sv]

Sammanfattningsvis behandlar denna studieplanering och hantering av material i byggprojekt och undersökningen utförs tillsammans med Yolean AB. Företaget har skapat ett koncept baserat på Lean Management och erbjuder i dagsläget ett hjälpmedel för att öka effektiviteten vad gäller planering av jobbaktiviteter. Förhoppningarna med denna studie är att kunna förstå om det även går att minimera branschens enorma materialspill. Således genom att identifiera det mest förekommande slöserierna inom byggbranschen har författarna lyckats skapa en förståelse för hur dagsläget ser ut vad gäller planering och hantering av material inom branschen samt diskuterat eventuella åtgärder som kan bidra till ökad effektivitet i detta flöde.

Syftet med denna undersökning är alltså att skapa en förståelse för hur materialplanering i dagsläget ser ut inom byggbranschen och vad som är de bakomliggande faktorerna till varför eventuella slöserier inom produktion av ett byggprojekt förekommer.

För att uppfylla detta syfte har studien baserats på en deduktiv ansats i samband med en fallstudie där rapportens teoretiska ramverk undersöks. Det används även en kvalitativ metod där fem olika företag inom branschen intervjuats. Detta underlag har i sin tur använts som utgångspunkt för att få djupare förståelse kring studiens syfte. Den kvalitativa metoden ger även en tillförlitlig grund för att besvara studiens frågeställningar.

Avslutningsvis har studien inte kommit fram till ett konkret svar gällande om företag använder en synkroniserad planering för både jobbaktiviteter och materialförsörjning av ett projekt. Dock framgår att majoriteten använder sig av separata planeringar för jobben som skall utföras och det material som behövs.

Undersökningen redogör för sju slöserier som anses mest förekommande vid produktion av en byggkonstruktion, vilka är interna förflyttningar, brist på material, oförutsägbara förändringar, yrkesarbetares timmar, maskinhaveri, brist på helhetsperspektivet och att material som kan återanvändas körs till deponi.

Arbete enligt Just-in-Time anses fördelaktigt för att minimera slöserier i en byggproduktion av anledningen att JIT synkroniserar projektets materialhantering och jobbaktiviteter. Likaså genom att arbeta med logistikpersonal skapas möjligheter att minska letandet efter material, främst på så sätt att arbeta med att placera material rätt från början och ett digitalt logistiksystem kan bidra till ett förbättrat kommunikationsflöde men också helhetsperspektivet hos involverade aktörer i byggprojekten.

Abstract [en]

In summary, this study deals with the planning and management of materials in construction projects and the research is carried out together with Yolean AB. The company has created a concept based on Lean Management and currently offers a tool to increase efficiency when it comes to planning job activities. The expectation with this research is to get an understanding whether it is also possible to minimize the industry's enormous material waste. Thus, by identifying the most common waste in the construction industry, the authors have managed to create an understanding of what the current situation looks like in terms of planning and handling of materials in the industry and discussed possible measures that can contribute to increased efficiency in this flow.

The purpose of this research is thus to create an understanding of what materialplanning currently looks like in the construction industry and the underlying factors as to why waste in the production of a construction project occurs.

To fulfill this purpose, the research has been based on a deductive approach in combination with a case study in which the report's theoretical framework is examined. A qualitative method is also used where five different companies in the industry have been interviewed. This data has in turn been used as a starting point for achieving a deeper understanding of the purpose of the study. The qualitative method also provides a reliable basis for answering the study's questions.

In conclusion, the study has not come to a concrete answer regarding whether companies use synchronized planning for both job activities and material supply of a project. However, it appears that the majority use separate planning for the jobs to be performed and the material needed.

The survey reports seven wastes that are considered most common in the production of a building structure, which are internal relocations, lack of materials, unpredictable changes, workers' working hours, engine breakdowns, lack of a holistic perspective and that materials that can be reused are driven to landfill.

Working Just-in-Time is considered advantageous to minimize waste in a construction production for the reason that JIT synchronizes the project's materialhandling and job activities. Similarly, working with logistics staff creates opportunities to reduce the search for materials, mainly in such a way as to work with placing materials right from the start and a digital logistics system can contribute to an improved communication flow but also the overall perspective of actors involved in construction projects.

Place, publisher, year, edition, pages
2021.
Keywords [sv]
bygglogistik, materialflöde, informationsflöde, materialplanering, slöserier
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hb:diva-26882OAI: oai:DiVA.org:hb-26882DiVA, id: diva2:1609159
Supervisors
Examiners
Available from: 2022-01-04 Created: 2021-11-07 Last updated: 2022-01-04Bibliographically approved

Open Access in DiVA

fulltext(853 kB)99 downloads
File information
File name FULLTEXT01.pdfFile size 853 kBChecksum SHA-512
164197e2f849f5194dcdd703010ded080d23b7fd3794f6298e1ce57f3121b27fc4605fc508aef4aac090378a82429efc51b6bf08b96dc829c60b71bffc8412f5
Type fulltextMimetype application/pdf

By organisation
Faculty of Textiles, Engineering and Business
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 100 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 168 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf