Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Bygglogistik: en undersökning av bygglogistiken kring Hulta Torg
University of Borås, Faculty of Textiles, Engineering and Business.
University of Borås, Faculty of Textiles, Engineering and Business.
2018 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Construction logistics : an analysis of construction logistics around Hulta Torg (English)
Abstract [sv]

Arbetsplatslogistiken inom byggbranschen har under många år undersökts och det finns stora möjligheter till förbättring. Det har kunnat konstateras att genom en förbättrad logistik går det att öka lönsamheten. Under senare år har en ny gren inom logistiken växt fram, tredjepartslogistik. Arbetet undersöker om tredjepartslogistik med inbärning till monteringsplatsen är ett lönsamt alternativ för Hulta Torg, samt att upprätta en inre arbetsplatsdispositionsplan (APD-plan) och lägga fram ett förslag.   Undersökningen har genomförts genom litteraturstudier och intervjuer. Litteraturstudien har fokuserats på bygglogistik och tredjepartslogistik och intervjuerna har förts med olika yrkesroller inom byggbranschen.  Resultatet visar att det finns brister i kommunikationen generellt inom byggbranschen och att det inom branschen finns utrymme till förbättring. Det är framförallt dialogen mellan huvudentreprenören och underentreprenören samt telefonaviseringen mellan leverantören och entreprenören det brister. Nyttjandet av en tredjepartslogistiker för att sköta inbärningen av material ställer sig branschen positiv till och det har kunnat konstaterats att det med största sannolikhet kommer att öka i framtiden. I resultatet presenteras en inre APD-plan som beskriver var material ska placeras för att få en så effektiv inre logistik som möjligt.   För att förbättra kommunikationen föreslås att varje morgon ha ett möte mellan huvudentreprenören och underentreprenören där dagens aktiviteter diskuteras. En tavla med leveransplaner som alla kan ta del av och uppdatera rekommenderas också. Entreprenören måste ställa högre krav på leverantören och ha det skriftligt i avtalen, efterföljs inte detta tas inte leveranserna emot. Kostnaden av en tredjepartslogistiker är dyrare än om entreprenören gjort det själv men de vinner produktionstimmar och att en kritisk del som hissen nyttjas även utanför ordinarie arbetstid. På den inre APD-planen placeras materialet nära där det ska monteras och gipsen ställs i mitten av rummen där ingen innervägg kommer att stå.   

Abstract [en]

Workplace logistics in the construction industry has been investigated for many years and there are great opportunities for improvement. It has been found that through improved logistics, profits can be increased. In recent years, a new branch of logistics has emerged, third-party logistics. The exam is investigating whether third party logistics with carrying support to the installation site is a profitable alternative for Hulta Torg, as well as establishing an internal workplace deployment plan and presenting a proposal that will benefit production.  The essay has been conducted through literature studies and interviews. The literature study has focused on building logistics and third-party logistics and the interviews have been conducted with different occupational roles in the construction industry.  The results show that there are shortcomings in communication generally in the construction industry and that there is room for improvement in the industry. It is primarily the dialogue between the main contractor and the subcontractor, as well as the notification between the supplier and the contractor, is lacking. The use of a third-party logistics to handle the delivery of materials benefits the industry and it has been found that it is most likely to increase in the future. The result presents an internal workplace deployment plan that describes where materials should be placed to get as efficient internal logistics as possible.  In order to improve communication, it is proposed that each morning have a meeting between the main contractor and the subcontractor where the activities of the day are discussed. A schedule of delivery plans that anyone can access and update is also recommended. The contractor must make higher demands on the supplier and have it in the agreement. If not followed, this will not be accepted. The cost of a third-party logistics is more expensive than if the contractor did it himself but they gain production hours and that a critical part like the lift is used for a larger part of the day. On the inner workplace deployment plan, the material is placed near where it should be mounted and the gypsum is placed in the middle of the rooms where no inner wall will stand.

Place, publisher, year, edition, pages
2018. , p. 27
Keywords [sv]
logistik, bygglogistik, tredjepartslogistik, totalkostnad, APD-plan
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hb:diva-21201OAI: oai:DiVA.org:hb-21201DiVA, id: diva2:1324032
Subject / course
Byggteknik - Högskoleingenjör
Available from: 2019-06-14 Created: 2019-06-13 Last updated: 2019-06-14Bibliographically approved

Open Access in DiVA

fulltext(849 kB)4 downloads
File information
File name FULLTEXT01.pdfFile size 849 kBChecksum SHA-512
e602916b9126fdfd7779c9201c153e002ce93a36ad0366486e51e0baeb55def668670522f6ed90a6887a61291153d0b6a557ebc1ac996e2c7778d050adb56eda
Type fulltextMimetype application/pdf

By organisation
Faculty of Textiles, Engineering and Business
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 4 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 29 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf