Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Effektiv logistik med lossningskalender på byggarbetsplatsen
University of Borås, Faculty of Textiles, Engineering and Business.
2018 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Efficient logistics with release calendar on construction sites (English)
Abstract [sv]

För att arbetsledaren skall utveckla en logistikorganisation som fungerar mer än väl bygger detta alltid på att de interna logistikrutinerna är välfungerande. Rutinerna skall fungera om riktlinjer och stöd för arbetsledaren i alla typer av projekt. Studien syftar att studera NCC-projekt som använder och/eller inte använder det nya verktyget, lossningskalender, för att identifiera dess positiva resultat Studien använder en kvalitativ metod där författaren genomför intervjuer med 4 respondenter inom NCC. Resultatdelen består av tre kategorier efter bearbetning av insamlade data, dessa är: Effektivisering, Dokumentering och Stöd för arbetsledning. Elektroniska logistikverktyg som lossningskalendern är av stor betydelse för arbetsledaren och kan vara avgörande i kvalitén i samtliga byggprojekt.

Abstract [en]

Logistics has long been a topic for discussion that has recently gained more attention. In order for the supervisor to develop a logistics organization that works more than well, this always means that the internal logistics routines are well functioning. The procedures should work on guidelines and support for the supervisor in all types of projects. The study aims to study NCC-projects that use and / or do not use the new tool, release calendar, to identify its positive results. The study uses a qualitative method in which the author conducts interviews with 4 respondents within NCC. The result consists of three main categories processing collected data, these categories are: Efficiency, documentation and Support for work management. Electronic logistics tools like the unloading calendar are of great importance to the supervisor and can be decisive in the quality of all construction projects.

Place, publisher, year, edition, pages
2018. , p. 27
Keywords [en]
Construction sector, Construction manager, Construction materials, Logistics chain, Unloading calendar
Keywords [sv]
Byggsektorn, Byggarbetsledare, Byggmaterial, Logistikkedjan, lossningskalender
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hb:diva-15340OAI: oai:DiVA.org:hb-15340DiVA, id: diva2:1265804
Subject / course
Byggteknik - Högskoleingenjör
Available from: 2018-11-27 Created: 2018-11-26 Last updated: 2019-08-27Bibliographically approved

Open Access in DiVA

fulltext(774 kB)790 downloads
File information
File name FULLTEXT01.pdfFile size 774 kBChecksum SHA-512
991405fc3982bad5ad7cea77498ecba54db55bf60a00d642ebd6bd75626e1550b47afe0ef16628e0a647625ff05022be446ca5f4e66456e165e0bf96827b67c4
Type fulltextMimetype application/pdf

By organisation
Faculty of Textiles, Engineering and Business
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 790 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1869 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf