Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Förbättringsarbete för att öka genomflödet i en linjeproduktion
University of Borås, Faculty of Textiles, Engineering and Business.
University of Borås, Faculty of Textiles, Engineering and Business.
2017 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Improvement work to increase the throughput of a serial production line (English)
Abstract [sv]

Syftet med denna studie är att öka förståelsen för hur ett ständigt förbättringsarbete kan eliminera problem som stoppar genomflödet i en linjeproduktion. Studien behandlar metoder för hur de största problemområdena och dess rotorsaker identifieras och hur arbetet mot att eliminera dem kan gå tillväga.  Studien har utförts på uppdrag av Estrella AB, beläget i Angered, och fokuserar på en begränsad del i deras produktion kallad kartongsystemet. För att uppfylla syftet genomfördes litteraturstudier inom berörda områden, intervjuer med personal och en mer omfattande studie kallad observationsstudien. En observerande studie där fokus låg på att göra tidsmätningar för att hitta de största problemområdena inom det studerade kartongsystemet.  Med hjälp av mätningarna kunde vidare analyser göras för att komma fram till problemens rotorsak och vart fokus för ett förbättringsarbete bör ligga och hur ett förbättringsarbete skulle kunna genomföras.  Observationsstudien och en analys av data visade att mänsklig påverkan och bristen på standarder är den största orsaken till varför stopp i genomflödet uppkommer.

Abstract [en]

The purpose of this study is to increase the understanding of how continuous improvement efforts can eliminate problems that stops the throughput of a serial production line. The study use methods for how the largest problem areas are found and how the work towards eliminating them can proceed.  The study was conducted on request from Estrella AB, a company located in Angered, focusing on a limited part of their production called the carton system. In order to fulfill the purpose, literature studies in the relevant areas were conducted, interviews with workers and a more comprehensive study called the observatory study. A observatory study where the focus was on finding time measurements to be able to find the largest problem areas within the student carton system.  With the help of the measurements, an analysis was made to find out the root cause for the problems. It also helped to find where the focus of an improvement work should be and how the work could be carried out. Through the observation study and an analysis of the data the conclusions were that human impact and the lack of standardized work is the main reason why stop in the throughput occurs.  

Place, publisher, year, edition, pages
2017.
Keywords [en]
Lean, Improvement work, troughput, linear production
Keywords [sv]
Lean, förbättringsarbete, genomflöde, linjeproduktion
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hb:diva-12804OAI: oai:DiVA.org:hb-12804DiVA, id: diva2:1147148
Subject / course
Industriell ekonomi
Available from: 2017-10-16 Created: 2017-10-05 Last updated: 2019-08-27Bibliographically approved

Open Access in DiVA

fulltext(1542 kB)918 downloads
File information
File name FULLTEXT01.pdfFile size 1542 kBChecksum SHA-512
4e90d303412061b343cd34a746579cd5336c0d00c06d97e499cd95352d471a91a5c38a300195bbd4edf69748154e80dcef2576685ba1cca085f99bc9c2fa501e
Type fulltextMimetype application/pdf

By organisation
Faculty of Textiles, Engineering and Business
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 919 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 820 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf