Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Förbättring av leveransprestation: En fallstudie av orderprocessen i ett uthyrningsföretag inom byggbranschen
University of Borås, Faculty of Textiles, Engineering and Business.
University of Borås, Faculty of Textiles, Engineering and Business.
2017 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Improving delivery performance : A case study of the order fulfillment process in a rental company in the construction industry (English)
Abstract [sv]

En undermålig leveransprestation av maskiner och utrustning skapar problem i hela försörjningskedjan för ett byggprojekt. Ifall maskiner och utrustning inte levereras efter överenskommen tid, bidrar det till stillestånd och förseningar av byggprojektet. Bygget stannar upp om inte rätt maskiner, finns på rätt plats, i rätt skick och i rätt kvantitet. Syftet med studien är att identifiera vilka moment som tillsammans utgör orderprocessen i uthyrningsbranschen och vad som påverkar tillförlitligheten av leveranser för uthyrning av maskiner och utrustning till byggbranschen. En processkartläggning har identifierat fem moment i orderprocessen, kundkontakt, ordermottagning, orderhantering, leverans och returer. För att veta hur väl orderprocessen presterar behöver mätetal införas. Utan mätetal är det svårt att veta ifall maskiner och utrustning levereras efter vad som överenskommits med kund. Mätetal underlättar även för förbättringar i processer då det går att jämföra mot tidigare mätetal för att se ifall en förbättring har blivit en förbättring eller enbart en förändring. En kombination av mätetal på tillförlitlighet från Supply Chain Operations Reference Model samt tillämpningar och metoder från Supply Chain Management kan förbättra tillförlitligheten av leveranser i en försörjningskedja som förser byggbranschen med maskiner och utrustning.  

Abstract [en]

A poor delivery performance of machines and equipment creates problems throughout the supply chain for a construction project. If machines and equipment do not arrive in compliance with agreed upon time, it will cause downtime and delays at the construction site. The construction site will come to a standstill if not the right machines is at the right place, at the right time, in the right condition and in the right quantity. The purpose of the report is to identify which elements constitute the order process for rental of machines and equipment, as well as provide suggestions on how the elements can be improved to increase the reliability of deliveries to and from construction projects. With process mapping five elements of the order process have been identified, customer support, receiving of orders, processing of orders, deliveries and returns. To know the performance of the order fulfillment, measurements need to be introduced. Without metrics, it is difficult to know if machines and equipment arrive at the construction site correctly. Metrics also facilitate improvements in processes as it is possible to compare to previous measures to see if an improvement has been an improvement or just a change. If metrics on reliability from the Supply Chain Operations Reference Model is combined with practices and methods from Supply Chain Management the reliability of deliveries in the supply chain that supplies the construction industry with machines and equipment can be improved.  

Place, publisher, year, edition, pages
2017.
Keywords [en]
Supply Chain Management, Logistics in the construction industry, Logistics, Supply Chain Operations Reference Model, Construction Supply Chain Management, Five Why, Ishikawa-diagram, Perfect order fulfillment.
Keywords [sv]
Supply Chain Management, Logistik inom byggbranschen, Logistik, Supply Chain Operations Reference Model, Construction Supply Chain Management, Fem varför, Fiskbensdiagram.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hb:diva-12802OAI: oai:DiVA.org:hb-12802DiVA, id: diva2:1147146
Subject / course
Mechanical engineering
Available from: 2017-10-16 Created: 2017-10-05 Last updated: 2019-08-27Bibliographically approved

Open Access in DiVA

fulltext(1029 kB)435 downloads
File information
File name FULLTEXT01.pdfFile size 1029 kBChecksum SHA-512
f042f4c2089f9aa20980d5950711bf3260b32fa4e2d558fbfdc62af85c2eb18505b890b5e1feeb92beba05536ca02912e21eff8485b54c1b6d2586c7d7862fd2
Type fulltextMimetype application/pdf

By organisation
Faculty of Textiles, Engineering and Business
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 439 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 688 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf