Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Optimering av produktflöde utifrån tillverkningstid och genomloppstid
University of Borås, Faculty of Textiles, Engineering and Business.
University of Borås, Faculty of Textiles, Engineering and Business.
2017 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Optimization of a product flow in consideration of manufacturing time and cycle time (English)
Abstract [sv]

Föreliggande arbete redogör för hur ett produktflöde optimeras utifrån tillverkningstid och genomloppstid. Genom att beröra teorier kring bland annat flöden, klockstudier, standardiserade arbetssätt och layout har ett produktflöde bestående av flera olika arbetsstationer kunnat optimeras. Undersökningen gjordes i syfte att belysa ett vanligt problem inom den tillverkande industrin, vilket resulterat i reducerade genom- och tillverkningstider. De ursprungliga genomloppstiderna uppmättes till 4 dagar 158 minuter för den första produkten och 4 dagar 162 minuter för den andra produkten. Efter optimering blev genomloppstiderna 4 dagar 80 minuter för den första produkten respektive 4 dagar 107 minuter för den andra, vilket innebär en minskning av genomloppstiderna på 78 respektive 55 minuter. De urprungliga tillverkningstiderna var 101 minuter för den första produkten respektive 135 minuter för den andra produkten. Efter implmenterad optimering uppmättes tillverkningstiderna till 78 minuter repsketive 106 minuter, vilket visar på förbättringar med 23 minuter för den första produkten och 29 minuter för den andra produkten. Avslutningsvis kan resultaten från arbetet tillämpas på andra tillverkande företag, eftersom det som beskrivits i rapporten till stor del är av generell natur.

Abstract [en]

This paper discusses how a product flow can be optimized considering the manufacturing and cycle times. The investigation shows how a product flow consisting of different workstations can be optimized. The aim of the investigation is to illustrate a common problem in the manufacturing industry, and has resulted in reduced cycle and manufacturing times. The original cycle times were 4 days 158 minutes for the first product and 4 days 162 minutes for the second product. After optimization, the cycle time for the first product was 4 days and 80 minutes and the cycle time for the second 4 days and 107 minutes. This shows an improvement of 78 minutes for the first product and 55 minutes for the second. The original manufacturing times were measured as 101 minutes for the first product and 135 minutes for the second product. The manufacturing times after optimization were 78 minutes for the first product and 106 minutes for the second, which shows an improvement of 23 minutes and 29 minutes respectively. In conclusion, the results in this paper are generic and can be applied by other manufacturing companies.

Place, publisher, year, edition, pages
2017.
Keywords [en]
Optimization, productflow, manufacturing time, cycle time
Keywords [sv]
Optimering, produktflöde, genomloppstid, tillverkningstid
National Category
Other Mechanical Engineering
Identifiers
URN: urn:nbn:se:hb:diva-12664OAI: oai:DiVA.org:hb-12664DiVA, id: diva2:1142964
Subject / course
Mechanical engineering
Supervisors
Examiners
Available from: 2017-10-13 Created: 2017-09-20 Last updated: 2019-08-27Bibliographically approved

Open Access in DiVA

fulltext(1087 kB)546 downloads
File information
File name FULLTEXT01.pdfFile size 1087 kBChecksum SHA-512
590114b7a5fc448baa3cb09dd9a3452d26d4ae62e7ad072f4762378b9fb6e373b083f719863423356d4a27b51a86762ebebaa1ab850c99fa952737ecb830e8f0
Type fulltextMimetype application/pdf

By organisation
Faculty of Textiles, Engineering and Business
Other Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 548 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 444 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • harvard-cite-them-right
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf